Did you miss me?

Ahem – 9 months or so – that’s pretty poor.  So, new year, new start, and, most importantly, a new laptop – this should mean it doesn’t take me 12 hours to actually get any post online.

I’m going to jump right in with what I’m doing right here, right now, and then maybe trawl back through some finished stuff from 2015 later on to catch up.

Remember the Onion Jumper?  14 shades of yellow, 15 shades of brown and green – dyed with yellow and red onion skins.  I made a start on the knitting during lambing last April, and then put it away to work on other projects… the kiss of death to anything.  Anyway, after the Christmas gift knitting craziness, I always feel the need to work on something just for me, and so I picked it up again at the beginning of this month.  I’m not very good at writing notes (no surprise there then!), so did spend some time trying to remember a few vital details, such as the needle size (3.25mm) and the colour changes (every round for the yellow, every 3 rounds for the green).  I suppose I never really intend to leave a project languishing for this long and of course always feel I’ll certainly remember what I was doing.

Since restarting, I’ve knitted the body from the bottom to the armpits, and I’ve started on the sleeves. onion bodyOh man – the sleeves!  Really starting to regret changing the colours every round for these.  I’m spit splicing all the ends, and that is a lot of splicing!  I’m knitting both sleeves at the same time on 2 circular needles.  Despite having painted the ends of one needle with red nail polish, I’m still beginning many rounds with the wrong needle and having to re-jig everything.  I suppose with the colour changes, the pattern (centred, so not starting at the beginning of the repeat), the sleeve increases, and the constant “help” from our puppy (a post in itself), it’s just too much for my old brain to cope with!  So, I’m finding the sleeves s.l.o.w., and can’t wait to get onto joining the arms and the body for the yoke.onion both sleeveI passed the half way mark last night, so some progress I guess.

I decided when I restarted this project that I’d work it as a raglan.  I completed a couple of top down raglans over Christmas and I like the shape.  It would have made more sense to knit this top down too, but I didn’t.  This meant working out how long I wanted the sleeves, then counting back so that both the colour repeat and the pattern repeat for the sleeves end at the same spot as on the body.   Only time will  tell if the maths has worked!

My hope is that the fairisle pattern will look good with the raglan decreases – I haven’t done any sort of swatching for this, so I’ll have to wait and see on that too.  I could have worked the original pattern as written of course.  Or I could have spun two big balls of yarn with long colour graduations to save all the splicing.  Or I could have knitted the jumper top down.  Any or all of these would have made this knit much easier!  Having got to the stage where I almost always spin with a project in mind, I really should make an effort to design my knitting before I cast on!  The destination would be more predictable, although the journey may not be quite as exciting.

Okay, this didn’t take too long to write.  I’ll show some of my Christmas knits next time.  Maybe it won’t take me another 9 months!

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s